Florham Park |
Code of Ordinances |
Part II. General Legislation |
Chapter 212. Subdivision and Site Plan Review |
Article III. Subdivisions |
§ 212-18. Fees.
Latest version.
-
A.Application for preliminary approval. A deposit shall be paid at the time of submission in accordance with § 212-9 of this chapter. The minimum deposit shall be $1,000, and $100 per individual lot, together with an inspection deposit of $2,000. There shall also be a final fee of $500. Any minor subdivision shall have an application fee of $500, and $50 per individual lot, together with an inspection deposit of $2,000.B.Installation of improvements and final plat. At the time of submission of construction plans for improvements, the applicant shall deposit with the Clerk a fee equal to 4% of the estimated improvement costs, as determined by the Borough Engineer, to cover the costs of inspection and examination of all plats, maps, drawings, construction of improvements and any other engineering or administrative expenses in connection with the subdivision. Where a surface water management plan is required by Article VII of this chapter, the fee therefor shall be waived, and all costs for review shall be included in these fees. Any of these moneys not otherwise expended shall be returned to the applicant upon approval of the installed improvements.
Amended 2-19-1985 by Ord. No. 2-85; 12-20-1994 by Ord. No.
16-94; 2-26-2008 by Ord. No. 08-1; 5-20-2008 by Ord. No. 08-17